| Flood
Categories |
| Minor
- Some public inconvenience, but minimal or no property damage
likely. |
 |
| Moderate
- Closure of secondary roads. Transfer to higher elevation may
be necessary to save property. Some evacuations may be required. |
 |
| Major
- Extensive inundation and property damage. Usually characterized
by the evacuation of people and livestock and the closure of
primary and secondary roads |
 |
| Record
- The highest observed River stage or discharge at a given site
during the period of record keeping. |
|
|
|
| ABRFC
Categorical Flood Forecast Verification |
 |
 |
Average
Lead Time
A categorical lead time is the number of hours from
the time of forecast issuance to the time of the forecast hit. A lead
time is only computed when, (1) the ordinate's forecast and observation
are in the same category, and (2) the previous ordinate's observation
was lower than the current category. This restricts lead time calculations
to instances where the stage is rising, and crossing categories. |
|